Suir Engineering is delivering the design, procurement, and construction of a new 140kV substation to support a confidential data centre development in Sweden.
The project includes the construction of a new client control building, incorporating three MV switch rooms, two battery rooms, and a central control room. In addition, works comprise a 140kV outdoor substation compound, including transformer foundations and civil, structural, and architectural (CSA) works for three (3 no.) 140/23kV transformers, a neutral earthing resistor (NER), and associated high-voltage incoming cabling.
The scope also includes the delivery of a high-voltage (140kV) grid connection from the TSO-owned Vattenfall Laggarhult substation to two (2 no.) 140/23kV transformers within the on-site substation, enabling power supply to the new facility.