Shannonbridge B
Shannonbridge B 220kV AIS Substation, 53MW BESS and Synchronous Condenser Hybrid Project
Suir Engineering successfully delivered the Shannonbridge B hybrid energy project, located in Shannonbridge, Co. Offaly. This landmark development is recognised as the world’s first hybrid Battery Energy Storage System (BESS) and Synchronous Condenser project.
The works comprised the construction of a contestable EirGrid 220kV substation and an IPP substation, integrated with a 63MW BESS installation and a 4000MVA synchronous condenser.
Suir Engineering also delivered the associated 220kV grid connection infrastructure, including a 220kV underground cable route connecting the new EirGrid Raghra 220kV station to the existing 220kV Shannonbridge ESB substation, enabling full integration into the transmission network.
Scope of work
- Civil Design and Construction of 220kV AIS Substation, IPP Building & IPP 220kV AIS yard, SynCon & BESS Compound
- Civil & Electrical Design of 220kV Grid Route
- Procurement & Installation of 220kV Cable
- Electrical Design, Procure and Installation of 110kV AIS Equipment.
- Design, Procure and Installation of 110/33/15.5kV three winding Grid Transformer.
- Design, Procure, Install and Commission Protection & Control Panels.
- Design, Procure, Install and Commission DC Battery Systems.
- Design, Installation and Test of Earthing System.
- Design, Procure, Installation and Commission client HV & MV Equipment.
- Management of Full Turnkey Project.
- Project Supervisor Construction Stage Role.
- Liaise and interface with Eirgird/ESBN & ESB Telecoms.
- Pre-Commissioning of Eirgirid Substation.
- Commissioning & DOF of Client Substation.
- Mechanical Installation of Synchronous Condenser & associated mechanical equipment
- Installation of SynCon & BESS – PCC Units
- Installation of 442 BESS Units & 22 MVPS Units