Suir Engineering is delivering an EPC synchronous condenser development in partnership with Siemens Energy for ESB Generation at the Moneypoint Generation Station. The project forms a key part of grid stability infrastructure and involves the installation of a synchronous condenser rated at 245 MVAr, 17 kV, and 3,000 rpm, connected to the grid via a 330 MVA 400/17 kV power transformer at the existing site.
The scope of works includes the civil design and construction of the synchronous condenser building and associated ancillary infrastructure, along with planning, environmental, and marine compliance activities. Suir Engineering is also responsible for the mechanical installation of free-issue equipment and the structural design and installation of the isolated phase busbar (IPB).
Electrical works encompass the design, procurement, and installation of balance-of-plant systems, control and protection systems, and the design, installation, and testing of the earthing system. The project also includes the design, procurement, and installation of building services systems, as well as commissioning support and assistance.