Laynes Wood 132kV Substation & Grid Connection
Laynes Wood 132kV Substation & Grid Connection
Suir Engineering successfully delivered the Laynes Wood 132/33kV substation and associated grid connection, providing critical infrastructure to support the network.
The project comprised the full construction of a 132/33kV Air Insulated Switchgear (AIS) substation, including an ICP connection. As part of the works, Suir Engineering installed a 132/33kV customer grid transformer and delivered a dedicated DNO control room building.
A key element of the project involved the construction and connection of an underground high-voltage (HV) cable route linking the substation to a nearby 132kV overhead line. This included the installation of a high-level 132kV cable sealing end and associated conductor works, as well as the supply and installation of all primary 132kV AIS substation equipment.
Suir Engineering also delivered all associated civil and electrical infrastructure, including ducting and cable trough systems, HV equipment plinths, and a comprehensive substation earthing grid. In total, approximately 150 metres of underground 132kV and 33kV HV cable was installed as part of the works.
Scope of work
The project scope was to execute the design, procurement, supply, construction, installation, testing and commissioning of a single line connection 132/33kV AIS substation, including associated civil works, ancillary works, LV distribution, control and protection interlocking schemes, SCADA system, electrification security fence, communications and CCTV. The role of the ICP (Independent Connection Provider) was undertaken, acting as the key liaison between the client (RWE), the design teams and the DNO (NGED). The design was developed, constructed, tested, commissioned and the substation was successfully energised as per the below scope.
- The installation of the 132/33kV grid transformer (90t) was completed, including construction of the transformer bund, crane lifting operations, electrical terminations and associated protection panels.
- The civil design and construction of the 132/33kV AIS substation compound were completed.
- The electrical design, procurement and installation of equipment were carried out.
- The AIS substation earthing grid was designed, installed and tested.
- Grid Code compliance studies were completed.
- The single line 132kV grid connection was designed and installed.
- The DNO control building was designed and installed.
- The DNO protection and control panels were designed, procured, installed and commissioned.
- Both DNO AC and DC auxiliary systems were designed, procured, installed and commissioned.
- Full project management of the project was successfully delivered.