Suir Engineering has been delivering electrical, instrumentation, and mechanical works at Dairygold’s Mitchelstown facility and associated sites across the Munster region since 1984, supporting continuous expansion and upgrade programmes within one of Ireland’s largest dairy processing operations.

Dairygold Co-Operative Society Limited is Ireland’s largest farmer-owned dairy business and the country’s second largest dairy processor. The Society headquarters is located in Mitchelstown, Co. Cork. Dairygold operates manufacturing facilities in Ireland, the UK, and France, with sales operations in Germany and Spain. The organisation employs over 1,100 people and generates a turnover of approximately €750 million from worldwide sales.

Across multiple projects ranging from minor works and shutdown support to major capital developments, Suir Engineering has contributed to upgrades across production, utilities, and site infrastructure within live operational environments.

The works delivered have included electrical installations, instrumentation and control systems, mechanical services, MV and LV distribution upgrades, process and utility integration, and support for plant expansion and refurbishment activities across the site.

Scope of work

Installation

  • Suir is on site in Dairygold Mitchelstown and subsidiary plants in the Munster region since 1984.
  • We have carried out multiple electrical, instrumentation and mechanical projects ranging from small works, shutdown works to large-scale projects.
  • In total our turnover for Dairygold alone to date has exceeded €30 million.
  • Working for various vendors and directly for the client, Suir Engineering employees have worked in all food manufacturing locations on behalf of Dairygold.
  • Examples of vendor packages undertaken by Suir Engineering:
    • Tuchaenhagen
    • GEA
    • Eurodia
    • Tetra Pack

Ongoing Works

Our works over the last 10 Years at Dairygold

  • 2025 Refrigeration Enabling works for Refrigeration later this year. MV Ring Cable replacement Throughout  the site.
  • 2024 Casein Dryer Project,  Completed Electrical for GEA on Process side.
  • 2024 Casein Dryer Project,  Completed Electrical Services, Lighting, Fire Alarm,  Air Handling Units and MV ring for 2 number 2MVA Transformers for Dairygold.
  • 2023 Wet Casein  Project,  Completed Electrical for GEA on Wet Process side.
  • 2023 Wet Casein  Project,  Completed Electrical for GEA. Completed Electrical Services, Lighting, Fire Alarm,  Air Handling Units and MV ring for 1 number 2MVA Transformer for Dairygold.
  • 2024 Milk Intake Project,  Completed Electrical for Tetra Pak on the process side.
  • 2024 Milk Intake  Project,  Completed Electrical Services, Lighting, Fire Alarm,  Air Handling Units and MV ring  cabling to be rerouted.
  • 2022 38KV Sub Station, Completed MV and LV cabling Including Commissioning with Neodyne.
  • 2021 Change over Power and  Control Cabling from old Switch room to New Switch Room while Intake was in Production closing down bays  for change over. These works involved tie ins with Dairygold, Seefin Engineering and  Eurodia.
  • 2020 working on Control System Upgrade in CHP Plant with Neodyne  for both Turbines.
  • 2019 Electrical works with Eurodia on upgrade of Demineralised Whey at ED Room and ED Tank Farm.
  • 2018 Enabling works with Dairygold to facilitate upgrade of Demineralised Whey at ED Room and ED Tank Farm.
  • 2017 Working with Gea on Electrical  works associated with Decanter at Effluent Treatment Plant.
  • 2016  Working with Gea France with Electrical works on Flash cooler at Crystallisation.
  • 2015 Working on Miscellaneous Projects throughout the site.