Denmark Data Centre

Sector Data Centres
Client Confidential
Duration 12 months
Region Denmark
IT Load 7mW

Suir Engineering delivered the fit-out of two data halls within an existing building at the client’s campus. Each data hall is rated at 3.5MW, providing a combined total of 7MW of critical load capacity.

The scope of works includes the full fit-out of Data Halls 5000 and 6000 within Building VIB.01, an existing 40,000m² data centre facility. Works comprise the construction of new gypsum board partitions, installation of intake and exhaust louvres, evaporative and filtration media, hot aisle containment systems, and all associated mechanical and electrical infrastructure required to bring the new data halls into operation.

Acting as General Contractor, Suir Engineering was responsible for project management, scheduling, completion of design, coordination, expediting, construction, commissioning coordination, and final handover of the facilities.

Suir Engineering had full responsibility for the delivery and integration of civil, architectural, electrical, and mechanical services installations.

All works were carried out within a live data centre environment, requiring careful planning and execution to ensure continuity of operations and protection of existing live services.

Scope of work

Electrical Services Installation

  • High voltage, 20kV, distribution system
  • All low voltage (480V, 415V, 400V) cabling and distribution, including containment and distribution boards
  • Dual duplex fibre backbone network for the PLC, SCADA and ENMS systems, site wide fire alarm and detection system
  • UPS cabling and distribution,
  • Final circuit cabling and containment.
  • All HV, LV, earth power cables for the DH5000 and 6000 equipment.
  • IT/Comms – All principal installation,
  • Heating & Cooling provision to each switchroom / external substation.
  • Internal lighting installation.
  • Emergency lighting installation
  • Internal and External small power installation
  • All power supplies
  • Fire detection and alarm system,
  • Aspirating smoke detection and interfacing.
  • Security systems including CCTV, access control and intruder alarm
  • Earthing and bonding. – Lightning protection system
  • All builders work associated with containment, chases, ducts and penetrations.
  • Overall testing and commissioning of all electrical services
  • All required handover documentation including as fitted record drawings, test certificates, operation and maintenance (O&M) manuals and health and safety fire information.

Civil, Structural and Architectural

  • Initial compound set-up including provision for security (hoarding, security hut, access turnstiles), pedestrian access, site offices, welfare, storage, workshop and applicable services
  • Protection of works areas local to live operating equipment
  • Forming of opes in external & internal walls, applicable floors and ceilings for ducted services, pipes and cable entries.
  • Making good and fire sealing of the appropriate opes as required
  • Installation of ceilings
  • Installation of Roof Pipe & Cable Entry Boxes
  • Installation of mezzanine.
  • Exterior Wall Cladding Panels.
  • Constructing new Partition Walls & Doors in appointed areas
  • GPR survey prior to work on underground services